犯罪、法律与司法科学与技术MoRTH pushes for an intelligent and clean constructionHindustan Times·1 个来源·阅读 1 分钟·上周·归档于2026年9月21日50% reduction in interest on the portion of mobilisation advance used to purchase eligible electric, hydrogen or biofuel-powered construction machineryMinistry of Road Transport and Highways (MoRTH)Vahan databasedigital monitoring requirements for construction workfinancial incentive to encourage highway developers to use alternative fuel-based and technology-enabled intelligent construction equipmentinterest rate for mobilisation advance (average one-year MCLR of the top five scheduled commercial banks plus 1.25 percentage points)mobilisation advance of up to 10% of the Total Project Costqualification conditions for interest relief requiring purchase and registration of new eligible equipment after project award within 90 days of the appointed daterequirement that automated systems on paving and compacting equipment record location, elevation, speed, number of passes, vibration status and asphalt surface temperaturerevised HAM Model Concession Agreement报告问题