Arunachal: Vehicles torched, MLA’s residence vandalised during Siang dam project protests
Hindustan Times2 个来源阅读 1 分钟
Arunachal cabinet forms high-level panel for Siang project survey
The Arunachal Pradesh cabinet on Wednesday approved the formation of an empowered high-level committee to guide and coordinate pre-feasibility report (PFR) survey-related activities for the proposed Siang Upper Multipurpose Project (SUMP), amid continuing opposition to the mega project from sections of the local population.
Hindustan Times1 个来源阅读 1 分钟
你已经看完了。

